Leed Checklist for the Morrill Hall Renovation
Yes - 2, No - 8, ? - 4 14 Points Sustainable Sites
Yes | ? | No | |||
Y | Prereq 1 | Erosion & Sedimentation Control | Required | ||
---|---|---|---|---|---|
1 | Credit 1 | Site Selection | 1 | ||
1 | Credit 2 | Urban Redevelopment | 1 | ||
1 | Credit 3 | Brownfield Redevelopment | 1 | ||
1 | Credit 4.1 | Alternative Transportation, Public Transportation Access | 1 | ||
1 | Credit 4.2 | Alternative Transportation, Bicycle Storage & Changing Rooms | 1 | ||
1 | Credit 4.3 | Alternative Transportation, Alternative Fuel Vehicles | 1 | ||
1 | Credit 4.4 | Alternative Transportation, Parking Capacity and Carpooling | 1 | ||
1 | Credit 5.1 | Reduced Site Disturbance, Protect or Restore Open Space | 1 | ||
1 | Credit 5.2 | Reduced Site Disturbance, Development Footprint | 1 | ||
1 | Credit 6.1 | Stormwater Management, Rate and Quantity | 1 | ||
1 | Credit 6.2 | Stormwater Management, Treatment | 1 | ||
1 | Credit 7.1 | Landscape & Exterior Design to Reduce Heat Islands, Non-Roof | 1 | ||
1 | Credit 7.2 | Landscape & Exterior Design to Reduce Heat Islands, Roof | 1 | ||
1 | Credit 8 | Light Pollution Reduction | 1 |
Yes - 3, No - 2 5 Points Water Efficiency
Yes | ? | No | |||
1 | Credit 1.1 | Water Efficient Landscaping, Reduce by 50% | 1 | ||
---|---|---|---|---|---|
1 | Credit 1.2 | Water Efficient Landscaping, No Potable Use or No Irrigation | 1 | ||
1 | Credit 2 | Innovative Wastewater Technologies | 1 | ||
1 | Credit 3.1 | Water Use Reduction, 20% Reduction | 1 | ||
1 | Credit 3.2 | Water Use Reduction, 30% Reduction | 1 |
Yes - 5, No - 4 17 Points Energy & Atmosphere
Yes | ? | No | |||
Y | Prereq 1 | Fundamental Building Systems Commissioning | Required | ||
---|---|---|---|---|---|
Y | Prereq 2 | Minimum Energy Performance | Required | ||
Y | Prereq 3 | CFC Reduction in HVAC&R Equipment | Required | ||
2 | Credit 1 | Optimize Energy Performance | 1 to 10 | ||
1 | Credit 2.1 | Renewable Energy, 5% | 1 | ||
1 | Credit 2.2 | Renewable Energy, 10% | 1 | ||
1 | Credit 2.3 | Renewable Energy, 20% | 1 | ||
1 | Credit 3 | Additional Commissioning | 1 | ||
1 | Credit 4 | Ozone Depletion | 1 | ||
1 | Credit 5 | Measurement & Verification | 1 | ||
1 | Credit 6 | Green Power | 1 |
Yes - 6, No - 4, ? - 3 13 Points Materials & Resources
Yes | ? | No | |||
Y | Prereq 1 | Storage & Collection of Recyclables | Required | ||
---|---|---|---|---|---|
1 | Credit 1.1 | Building Reuse, Maintain 75% of Existing Shell | 1 | ||
1 | Credit 1.2 | Building Reuse, Maintain 100% of Shell | 1 | ||
1 | Credit 1.3 | Building Reuse, Maintain 100% Shell & 50% Non-Shell | 1 | ||
1 | Credit 2.1 | Construction Waste Management, Divert 50% | 1 | ||
1 | Credit 2.2 | Construction Waste Management, Divert 75% | 1 | ||
1 | Credit 3.1 | Resource Reuse, Specify 5% | 1 | ||
1 | Credit 3.2 | Resource Reuse, Specify 10% | 1 | ||
1 | Credit 4.1 | Recycled Content, Specify 5% (post-consumer + ½ post-industrial) | 1 | ||
1 | Credit 4.2 | Recycled Content, Specify 10% (post-consumer + ½ post-industrial) | 1 | ||
1 | Credit 5.1 | Local/Regional Materials, 20% Manufactured Locally | 1 | ||
1 | Credit 5.2 | Local/Regional Materials, of 20% Above, 50% Harvested Locally | 1 | ||
1 | Credit 6 | Rapidly Renewable Materials | 1 | ||
1 | Credit 7 | Certified Wood | 1 |
Yes - 8, No - 3, ? - 4 15 Points Indoor Environmental Quality
Yes | ? | No | |||
Y | Prereq 1 | Storage & Collection of Recyclables | Required | ||
---|---|---|---|---|---|
Y | Prereq 1 | Minimum IAQ Performance | Required | ||
Y | Prereq 2 | Environmental Tobacco Smoke (ETS) Control | Required | ||
1 | Credit 1 | Carbon Dioxide (CO2 ) Monitoring | 1 | ||
1 | Credit 2 | Ventilation Effectiveness | 1 | ||
1 | Credit 3.1 | Construction IAQ Management Plan, During Construction | 1 | ||
1 | Credit 3.2 | Construction IAQ Management Plan, Before Occupancy | 1 | ||
1 | Credit 4.1 | Low-Emitting Materials, Adhesives & Sealants | 1 | ||
1 | Credit 4.2 | Low-Emitting Materials, Paints | 1 | ||
1 | Credit 4.3 | Low-Emitting Materials, Carpet | 1 | ||
1 | Credit 4.4 | Low-Emitting Materials, Composite Wood & Agrifiber | 1 | ||
1 | Credit 5 | Indoor Chemical & Pollutant Source Control | 1 | ||
1 | Credit 6.1 | Controllability of Systems, Perimeter | 1 | ||
1 | Credit 6.2 | Controllability of Systems, Non-Perimeter | 1 | ||
1 | Credit 7.1 | Thermal Comfort, Comply with ASHRAE 55-1992 | 1 | ||
1 | Credit 7.2 | Thermal Comfort, Permanent Monitoring System | 1 | ||
1 | Credit 8.1 | Daylight & Views, Daylight 75% of Spaces | 1 | ||
1 | Credit 8.2 | Daylight & Views, Views for 90% of Spaces | 1 |
Yes - 5 5 Points Innovation & Design Process
Yes | ? | No | |||
1 | Credit 1.1 | Innovation in Design: Exemplary Construction Recycling | 1 | ||
---|---|---|---|---|---|
1 | Credit 1.2 | Innovation in Design: Community Outreach | 1 | ||
1 | Credit 1.3 | Innovation in Design: Green Cleaning and Pest Control | 1 | ||
1 | Credit 1.4 | Innovation in Design: Area of rest and relaxation | 1 | ||
1 | Credit 2 | LEEDTM Accredited Professional | 1 |
Yes - 29, No - 20, ? - 12 69 Points Project Totals (pre-certification estimates)
Certified 26-32 points | Silver 33-38 points | Gold 39-51 points | Platinum 52-69 points |